题目
题目
单项选择题

Time–cost models attempt to develop a minimum- schedule for an entire project. 题目解析 X 正 在 帮 您 自 动 填 写 . . . Analysis of the True/False Statement The statement "Time–cost models attempt to develop a minimum-schedule for an entire project" is FALSE. Why the Statement is False Time-cost models aim to develop a minimum-COST schedule for an entire project, not just a minimum schedule. Key Points about Time-Cost Models They balance both time and cost factors. They aim to optimize the relationship between project duration and total cost. The goal is to find the most cost-effective schedule, not necessarily the shortest schedule. They consider trade-offs between time reduction and associated costs. Important Considerations Crashing activities (reducing duration) typically increases direct costs. The shortest possible schedule is not always the most economical. The model seeks an optimal balance between time and cost. Conclusion The statement is incorrect because it oversimplifies the purpose of time-cost models by focusing only on minimizing schedule without considering the cost aspect, which is a crucial component of these models. Therefore, the correct answer is FALSE because time-cost models are about optimizing both time AND cost, not just developing a minimum schedule. 点赞

查看解析

查看解析

标准答案
Please login to view
思路分析
Question restatement: The statement given is that Time–cost models attempt to develop a minimum-schedule for an entire project. Answer options: ["False"]. Analysis of the single option: - Option: False - Why this statement is true: Time–cost models are designed to optimize the trade-off between project duration and total cost. They do not pur......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

类似问题

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!