题目
题目
多项填空题

Question at position 7 Match the following based on V Model Prompt 1System AnalysisAnswer for prompt 1 System Analysis[input]Prompt 2Requirement GatheringAnswer for prompt 2 Requirement Gathering[input]Prompt 3Software DesignAnswer for prompt 3 Software Design[input]Prompt 4Module DesignAnswer for prompt 4 Module Design[input]Possible answersCode Compilation CheckSystem TestingAcceptance TestingIntegration TestingUnit TestingLoad TestingUsability Testing

选项
A.Code Compilation Check
B.System Testing
C.Acceptance Testing
D.Integration Testing
E.Unit Testing
F.Load Testing
G.Usability Testing
查看解析

查看解析

标准答案
Please login to view
思路分析
The problem asks you to match each prompt from the V-Model with the appropriate testing or verification activity, based on the provided answer set. Option by option analysis helps reveal why the given mappings fit or don’t fit. - Code Compilation Check: This activity is primarily a build/compile-time verification rather than a formal test of design or requirements. It does not correspond to any of the four prompts (System Analysis, Requirement Gathering, Software Design, Module Design) in the V-Model mapping, so it is not a correct match for any prompt. - System Testing: This option is claimed to correspond to Prompt 1 System Analysis. In the V-Model, System Testing is designed to validate the complete, integrated system against the overall requirements. System Analysis is an early-phase activity where requirements and high-level system behavior are cla......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!