Part 1Which of the following was NOT a network planning method developed in the 1950s? A. the program evaluation and review technique (PERT) B. the network project analysis technique (NPAT) C. the critical path method (CPM)
选项
A.A. the program evaluation and review technique (PERT)
B.B. the network project analysis technique (NPAT)
C.C. the critical path method (CPM)
查看解析
标准答案
Please login to view
思路分析
Question restatement: Which of the following was NOT a network planning method developed in the 1950s?
Options:
A. the program evaluation and review technique (PERT)
B. the network project analysis technique (NPAT)
C. the critical path method (CPM)
Option A: 'the program evaluation and review technique (PERT)'. PERT is a renowned network planning method developed in the 1950s, specifically by the U.S. Navy and industrial engineers to analy......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
An activity with positive slack can be delayed without impacting the overall project completion time.
Assume that an activity can begin only after two other activities are completed. If the earliest completion time of one predecessor is twenty days, and the earliest completion time of the other predecessor is seventeen days, then the earliest start time of this activity must be twenty days.
Why do network diagrams typically precede Gantt charts in complex projects?
Question12 How can free float be used to shorten a project schedule?Select one alternative: By finishing the tasks with free floats sooner. By delaying the tasks with free float. By assigning free floats to the tasks in critical path to put the pressure off from resources. By reallocating resources from non-critical task with free float to the concurrent tasks in critical path. ResetMaximum marks: 2