Homework:Ch 08 Homework

单项选择题

Part 1Which of the following was NOT a network planning method developed in the​ 1950s? A. the program evaluation and review technique​ (PERT) B. the network project analysis technique​ (NPAT) C. the critical path method​ (CPM)

选项
A.A. the program evaluation and review technique ​ (PERT)
B.B. the network project analysis technique ​ (NPAT)
C.C. the critical path method ​ (CPM)
查看解析

查看解析

标准答案
Please login to view
思路分析
Question restatement: Which of the following was NOT a network planning method developed in the 1950s? Options: A. the program evaluation and review technique (PERT) B. the network project analysis technique (NPAT) C. the critical path method (CPM) Option A: 'the program evaluation and review technique (PERT)'. PERT is a renowned network planning method developed in the 1950s, specifically by the U.S. Navy and industrial engineers to analy......Login to view full explanation

登录即可查看完整答案