The Project Manager is creating an estimate for building a house. It is a house similar to what he builds often. He is using a figure of $2000 per square metre to calculate the estimate. What type of estimating is this?
查看解析
标准答案
Please login to view
思路分析
The question describes the Project Manager creating an estimate for building a house using a constant rate of $2000 per square metre. This prompts us to identify the estimating approach being used.
First, consider what parametric estimating involves: it applies a unit rate (a parameter) to a measurable attribute of the project to generate an overall estimate. In this case, the measurable attribute is the floor area in square metres, and the unit rate is $2000 pe......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
In a consumer society, many adults channel creativity into buying things
Economic stress and unpredictable times have resulted in a booming industry for self-help products
People born without creativity never can develop it
A product has a selling price of $20, a contribution margin ratio of 40% and fixed cost of $120,000. To make a profit of $30,000. The number of units that must be sold is: Type the number without $ and a comma. Eg: 20000
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!