The volume-variety position of an operation has implications for almost every aspect of its design activities. In a low-volume, high-variety operation, which is the correct combination of design decisions?
选项
A.Product/service standardization low, flow intermittent
B.Product/service standardization high, flow intermittent
C.Product/service standardization high, flow continuous
D.Product/service standardization low, flow continuous
查看解析
标准答案
Please login to view
思路分析
The question asks about the volume-variety position of an operation and the appropriate design decisions for a low-volume, high-variety scenario. We'll evaluate each option in that light.
Option 1: 'Product/service standardization low, flow intermittent' — This pairing aligns with the need for flexibility in a high-variety context. Low standardization means products or services are not tightly specified and can be tailored to each order, while intermittent flow supports sp......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
The process of converting inputs such as raw materials into outputs such as finished products is the ______ model of Operations Management.
Operations challenges include:
Question at position 16 If the Products and services produced on-specification and having Less recycling and wasted effort within the process design, which performance objective is more likely the organization is following?FlexibilityCostSpeedQualityClear my selection
位置16的问题 ................has experimented with sophisticated sound systems ,simpler menu boards and see-through food bags to ensure greater accuracy.StarbucksBurger kingMcDonaldsNone of the Above清除选择
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!