4510_DESST_3514 Wk7 Lecture: Cost & Program
单项选择题
2. According to the cost influence curve, when is it most cost-effective to make design changes?
选项
A.A. During construction
B.B. During the documentation stage
C.C. During the tender process
D.D. During the concept and early design stages
查看解析
标准答案
Please login to view
思路分析
The question asks when it is most cost-effective to make design changes according to the cost influence curve.
Option A: During construction. Making changes during construction tends to be very expensive because it requires altering already-built elements, disrupting on-site work, potential rework, ......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
In a consumer society, many adults channel creativity into buying things
Economic stress and unpredictable times have resulted in a booming industry for self-help products
People born without creativity never can develop it
A product has a selling price of $20, a contribution margin ratio of 40% and fixed cost of $120,000. To make a profit of $30,000. The number of units that must be sold is: Type the number without $ and a comma. Eg: 20000
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!