You are considering the following two mutually exclusive projects. The crossover rate between these two projects is _________ blank percent and Project _________ blank should be accepted if the required return is greater than the crossover rate. Year Project A Project B 0 −$ 22,000 −$ 22,000 1 7,500 15,550 2 7,500 5,500 3 15,500 7,570

选项
A.15.93; B
B.17.12; A
C.15.93; A
D.12.45; B
E.12.45; A
查看解析

查看解析

标准答案
Please login to view
思路分析
The problem presents two mutually exclusive projects and asks for the crossover rate and which project to accept when the required return changes. The crossover rate is the discount rate at which the NPVs of the two projects are equal; beyond this rate, one project becomes preferable over the other. Option by option analysis: Option: "15.93; B" - This option states the crossover rate is 15.93% and that Project B should be accepted when the required return is greater than the crossover rate. If we compare the NPVs of A and B at a rate above 15.93%, B tends to have a higher NPV due to its larger early cash inflows (1st year) relative to A. This aligns with the typ......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

类似问题

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!