2258-1_20CM3034001 Types of Construction Project Costs

单项选择题

Direct costs are typically subdivided into which four categories?

选项
A.Labor, Equipment, Materials, Subcontractors/Services
B.Labor, Indirect Costs, Insurance, Bonds
C.Overheads, Materials, Supervision, Equipment
D.Labor, Contingency, Allowance, Insurance
查看解析

查看解析

标准答案
Please login to view
思路分析
When we assess the question about how direct costs are typically subdivided, we should examine what elements are normally categorized as direct costs in cost accounting. Option 1: Labor, Equipment, Materials, Subcontractors/Services. This set aligns with the standard breakdown of direct costs, which include the direct labor, the equipment used for a spe......Login to view full explanation