题目
2258-1_20CM3034001 Types of Construction Project Costs
单项选择题
Direct costs are typically subdivided into which four categories?
选项
A.Labor, Equipment, Materials, Subcontractors/Services
B.Labor, Indirect Costs, Insurance, Bonds
C.Overheads, Materials, Supervision, Equipment
D.Labor, Contingency, Allowance, Insurance
查看解析
标准答案
Please login to view
思路分析
When we assess the question about how direct costs are typically subdivided, we should examine what elements are normally categorized as direct costs in cost accounting.
Option 1: Labor, Equipment, Materials, Subcontractors/Services. This set aligns with the standard breakdown of direct costs, which include the direct labor, the equipment used for a spe......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
Which of the following is a noncontrollable expense?
Costs that are not easily traceable to a specific cost object are known as:
‘Cost of software licenses’ would be classified as ______________________ i. Developmental cost ii. Operational cost iii. Variable cost iv. Direct cost
Question at position 10 Which of the following is not a variable expense?Janitorial ExpensesManagement FeesUtilitiesReal Estate Taxes
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!