题目
题目

APSC_V 450 201 2024W2 Week 5 Quiz

单项选择题

An engineering firm is hired to design a new pedestrian bridge for a city. During the design phase, the lead engineer realizes that the project requires expertise in seismic design, which they lack. Instead of seeking guidance from a seismic design expert, the engineer proceeds with the design, assuming it will be "good enough." After construction, an earthquake causes significant structural damage to the bridge, leading to injuries and property damage. The court determines that both the engineer and the contractor (who failed to follow some safety protocols during construction) were negligent. How will the court most likely handle liability in this case?

选项
A.The liability will be based on the degree of responsibility assigned by the judiciary
查看解析

查看解析

标准答案
Please login to view
思路分析
The question asks how liability will be handled when both the engineer and the contractor are found negligent in the construction of a bridge. The key concept here is fault-based liability and how courts allocate responsibility. Option: 'The liability will be based on the degree of responsibility assigned by the judiciary.' This reflects the principle of comparative or apportionm......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!