A startup called RoboBar makes two types of custom protein bars: Chocolate Power and Peanut Blast. The company estimates that the annual demand for Chocolate Power bars is 10,000 units, and each bar requires 6 minutes of processing on the mixing machine. Chocolate Power bars are produced in lots of 500 units, with each lot requiring 0.5 hours of setup. Peanut Blast bars have an annual demand of 5,000 units, and each bar requires 12 minutes of processing. Peanut Blast is produced in lots of 250 units, with 1 hour of setup per lot. Each mixing machine is available for 1,000 hours per year, and the company wants to maintain a 10% capacity cushion. How many mixing machines are required to meet the annual demand?

选项
A.4
B.3
C.2
D.5
查看解析

查看解析

标准答案
Please login to view
思路分析
We’re asked to determine how many mixing machines RoboBar needs to meet annual demand with a 10% capacity cushion. Here’s a step-by-step breakdown of the calculations and evaluation of each option. First, compute the annual processing time required for each product: - Chocolate Power: demand 10,000 units, 6 minutes per bar. - Processing time = 10,000 bars × 6 minutes = 60,000 minutes = 1,000 hours. - Peanut Blast: demand 5,000 units, 12 minutes p......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

类似问题

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!