Compute the following overhead rates using the activity-based costing approach.  (Round answer to 0 decimal places, e.g. 12.) Machining = $[Fill in the blank], per machine hour Machine Setup = $[Fill in the blank], per setup hour

查看解析

查看解析

标准答案
Please login to view
思路分析
We start by restating what the problem asks: compute overhead rates using activity-based costing (ABC) and round to the nearest dollar (0 decimal places). The two blanks correspond to two separate overhead cost pools and their respective activity drivers: Machining per machine hour, and Machine Setup per setup hour. In ABC, each overhead cost pool is assigned to products based on a chosen activity measure (driver) that correlates with the consumption of the overhead pool. The typical steps are: (1) identify cost pools (e.g., machining overhead, setup overhead), (2) determine an appropriate activity driver for each pool (e.g., hours of machine time for machining, number of setups for setup overhead), (3) compute the rate for each pool by dividing the total overhead in ......Login to view full explanation

登录即可查看完整答案

我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。

类似问题

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!