Question at position 6 Enrique manufactures earrings at his factory in Dublin, OH. He is trying to determine if there is a bottleneck in his welding department that may be slowing down his production of diamond nose rings. To determine if there is a delay Enrique has recorded data from 3 separate days and taken 3 random readings of how long each earring takes (in seconds) to be welded (see table). Calculate the X-bar-bar of the welding process in the earring factory. (round your answer to 2 decimal places) [table] Sample/Day | Day 1 | Day 2 | Day 3 1 | 13.24 | 13.89 | 13.76 2 | 12.56 | 11.98 | 12.34 3 | 15.01 | 14.33 | 12.39 [/table] Answer Enrique manufactures earrings at his factory in Dublin, OH. He is trying to determine if there is a bottleneck in his welding department that may be slowing down his production of diamond nose rings. To determine if there is a delay Enrique has recorded data from 3 separate days and taken 3 random readings of how long each earring takes (in seconds) to be welded (see table). Calculate the X-bar-bar of the welding process in the earring factory. (round your answer to 2 decimal places) [table] Sample/Day | Day 1 | Day 2 | Day 3 1 | 13.24 | 13.89 | 13.76 2 | 12.56 | 11.98 | 12.34 3 | 15.01 | 14.33 | 12.39 [/table] [input]
Options
A.
View Explanation
Verified Answer
Please login to view
Step-by-Step Analysis
To tackle this problem, I will first break down the data by day and compute the average welding time for each day, since X-bar-bar is the average of these daily means.
Day 1 readings: 13.24, 12.56, 15.01
- Sum = 13.24 + 12.56 + 15.01 = 40.81
- Day 1 mea......Login to view full explanationLog in for full answers
We've collected over 50,000 authentic exam questions and detailed explanations from around the globe. Log in now and get instant access to the answers!
Similar Questions
Construct a 3-sigma x-bar chart for the length in centimeters of a part from the following table. What is the upper control limit? Sample # Observation 1 Observation 2 Observation 3 Observation 4 1 0.486 0.499 0.493 0.511 2 0.499 0.506 0.516 0.494 3 0.496 0.5 0.515 0.488 4 0.495 0.506 0.483 0.487 5 0.472 0.502 0.526 0.469 6 0.473 0.495 0.507 0.493 7 0.495 0.512 0.49 0.471 8 0.525 0.501 0.498 0.474 9 0.497 0.501 0.517 0.506 10 0.495 0.505 0.516 0.511
For a production process using statistical process control, where each sample has 4 observations in it, let = 9.35 inches and = 3 inches. What is the lower control limit for the -chart?
In a consumer society, many adults channel creativity into buying things
Economic stress and unpredictable times have resulted in a booming industry for self-help products