题目
MGS*3100*01.2025FA Test 03: Chap 10,11
单项选择题
Which one of the following statements is best?
选项
A.The level of safety stock maintained decreases when the standard deviation of demand during lead-time increases.
B.The level of safety stock maintained decreases when the desired cycle-service level increases.
C.The level of safety stock maintained is greater if mean absolute deviation (MAD) is used rather than standard deviation in estimating forecast errors.
D.When no safety stock is maintained, stockouts will occur during approximately 50% of the cycles.
查看解析
标准答案
Please login to view
思路分析
When evaluating statements about safety stock and inventory levels, it helps to unpack the underlying concepts and check each claim against standard inventory theory.
Option 1: The level of safety stock maintained decreases when the standard deviation of demand during lead-time increases.
- Why this seems wrong: Safety stock is typically used to buffer against variability in demand during lead time. As the standard deviation (a measure of variability) increases, the required safety stock usually increases, not decreases, to maintain the same service level. Therefore this statement contradicts the conventional relationship between demand variability (lead-time variabilit......Login to view full explanation登录即可查看完整答案
我们收录了全球超50000道考试原题与详细解析,现在登录,立即获得答案。
类似问题
Question at position 27 In an inventory management system, Service Level is:the probability demand will not always be satisfied during the ordering lead timethe percentage of time during lead time that demand is not satisfiedthe probability that demand is met from inventorythe percentage of demand not satisfied from inventory
A famous fantasy writer has published a new novel. Bookstores expect that at least some customers will want the book, but whether it will become a best-seller is less certain. The bookstores’ primary inventory management challenge is deciding
A company that is able to keep enough parts available to manufacture its products without having too many left over is probably relying on a
Scenario 9.2 Shipments of Product X from a plant to a wholesaler are made in lots of 1500 units each. The wholesaler's average demand for X is 300 units per week. The lead time from the plant to the wholesaler is 3 weeks. The wholesaler pays for the shipments when they leave the plant. Refer to Scenario 9.2. What is the total of the wholesaler's current cycle plus pipeline inventories?